安裝&試機
Installation & testing

安裝完成後會緊接著做測試,同時指導現場人員如何操作機台。

Testing will be done after the installation is completed, the on-site personnel will be instructed on how to operate the machine.

保養
Maintainance

良好的運作需要您持續維持好的保養,每次使用前後多一個清潔的動作可以避免阻塞,使工作過程更流暢。

Good operation requires you to maintain good maintenance continuously. One more cleaning action before and after each use can avoid blockage and make the working process smoother.

維修
Repair

請多加利用Line、Email或是電話聯繫等方式充分告知您的需求(如:提供照片或影片)以加速我們協助及解決問題。

Please make full use of Line, Email or telephone to fully inform your needs (such as providing photos or videos) to speed up our assistance and problem solving.

整廠設備
Whole plant equipment

可依照客戶需求設計、製造。

Can be designed and manufactured according to customer needs.

樣品測試
Test sample

寄送樣品前請讓我們知道收貨時間、物品、和數量

樣品數量請至少準備20公斤或是半袋的工作物

測試完畢會提供拍照、影片

有任何問題也歡迎來電詢問

Please let us know the receiving time, item, and quantity before sending the sample.

For the sample quantity, please prepare at least 20 kg or half a bag of working materials.

Photos and videos will be provided after the test.

If you have any questions, please do not hesitate to contact us.